KB17333: How to set project level prioritization in MicroStrategy Intelligence Server version 9.4.1 and later


Community Admin

• Strategy


Job Prioritization allows an administrator to prioritize a project based on Cost, User Groups, Request Type, Application Type and Projects.
 
Perform the following steps to open the interface.
 

  • Log on to Strategy Desktop 9.x with Administrator privileges.
  • Expand the Administration icon.
  • Click on 'Database Instance Manager'. On the right side, user can see the various database instances available. Open the database instance to be edited.
  • Select the third tab in the Database Instance window, 'Job Prioritization' as shown below. This screen shot depicts the Job Prioritization default settings.
ka04W000000OhoIQAS_0EM440000002BPT.jpeg

Perform the following steps to open the 'Job Prioritization Wizard'.
 

  • Click 'New'.
  • Click 'Next' on the 'Welcome-window'.
  • Select the entry or entries on which to prioritize the project as shown below:
ka04W000000OhoIQAS_0EM440000002BPW.jpeg
  •  
    For example, if changing the prioritization for a particular project select 'Project' and click Next.
     
  • Select which projects that need prioritization and move them to the right. Once all the projects that are going to be prioritized are moved over, click next:
ka04W000000OhoIQAS_0EM440000002BPO.jpeg
    • All jobs from the project will be effected by this prioritization
  • Select the priority that each project should have. In the example below all jobs from Strategy Tutorial are granted a high priority. Once completed click finish.
ka04W000000OhoIQAS_0EM440000002BPS.jpeg
    • By Default, medium is the selected priority. Changing this to high will allow all jobs from the selected project to run at a high priority.
  • After clicking finish the new prioritization will be shown:
ka04W000000OhoIQAS_0EM440000002BPi.jpeg
  •  
    After adding prioritization the number of connections by priority should be addressed as well. Change each of the three priorities to the correct number of connections.
     