KB18968: How to create and use links for reports and documents in MicroStrategy Web 9.4.1


Stefan Zepeda

Salesforce Solutions Architect • Strategy


KB18968: How to create and use links for reports and documents in MicroStrategy Web 10.x

INTRODUCTION
Linking is a new feature introduced in Strategy 9.4.1 for both traditional reports as well as OLAP cube reports. It is the ability to explore additional, related data by executing another document or report from within a document or report, in either Strategy Developer or Strategy Web 9.4.1.
 
A link allows context to be passed to any prompted report or document, whether the destination report or document is related to the original.
 
Pre-requisites to creating links:
Before creating links, users should:
 

  1. Ceate the source and target documents and reports.
  2. Know what types of prompts the targets require and how they will be answered

Creating a link:
Links are created using the Link editor. To access it, do one of the following:
 

  • In a report, right-click an object and select Edit Links.
  • In a document, right-click a grid/graph displayed as a grid, and select Edit Grid. Right-click an object in the Grid/Graph and select Edit Links, as shown below:
ka02R000000kc0sQAA_0EM440000002Eoc.jpeg

The following link editor opens:
 

ka02R000000kc0sQAA_0EM440000002Eoa.jpeg

 

  1. Click New to create a new link. Give the link a name.
  2. Click the Browse button (...) next to Run this report or document to find and select the target report or document.
  3. Assume the target report has a prompt. In this case select a prompt in the Target prompts list.
  4. Select a Prompt Answer Method from the following table below. By default, the Prompt user method is selected for these prompts.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.

     
    Google Map in VIGoogle MapApple MapGoogle Map in RSDGoogle MapApple MapESRI Map in VIESRI MapApple MapESRI Map in RSDESRI MapApple Map in 10.1 (showing Grid in 10 and lower)TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user wakes up and decides to trigger a manual or custom time window data load at 5am, 1 hour before the next scheduled data load.Because this is a manual or custom time window data load, the 'Last data load start time' is not affected.6amAt 6am, the scheduled data load kicks off, not affected by the manual or custom time window data load.The 'Last data load start time' is 12am, the frequency is 6 hours, so the data load is triggered as desired.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amAn administrative user shuts down the intelligence server for maintenance.The data load schedule is not stopped.6amThe Intelligence Server is still shut down. At 6am, the scheduled data load kicks off, but fails.Because the data load kicked off, the 'Last data load start time' is set to 6am, the frequency is 6 hours, so the next data load will occur at noon. If the Intelligence Server is up and running at noon, the data load will migrate data over the entire time period since the last successful data load finish time.TimeEventDetails12amA scheduled data load occurs at 12am as desired.The 'Last data load start time' is set to 12am.5amThe data load schedule is stopped by an Administrator for system maintenance. 6amAt 6am, nothing happens.The data load schedule is still stopped.9amMaintenance finishes and the data load schedule is started again. 9am and 1 secondThe data load schedule process checks, and finds that the 'Last data load start time' plus 'frequency' is less than the current time, so the data load kicks off immediately.The data load kicks off immediately, setting the 'last data load start time' to 9am.Prompt Answer MethodRequirementsPrompts in the Target Are Answered By...Answer with the same promptSame prompt in the target and sourceThe prompt answer from the sourcePrompt userNoneThe user (prompts are displayed when the target is executed)Default answerNoneThe default prompt answer for the target promptDynamicallyAttribute element prompt in targetThe object selected in the source (for example, the attribute element that the user clicked on)Empty answerTarget prompt must not be requiredNothing (no prompt answer is provided from the source and the user is not prompted)Static element listAttribute element prompt in targetThis prompt overrides the prompt ansnwers from the source with a list of elements. Selecting this option makes the Element List area available to select the elements to be passed as answers to the element list prompt in the target.Current unitHierarchy prompt in targetSimilar to the Dynamic prompt answer method, where the prompt is answered using the object selected in the source.All valid unitsHierarchy prompt in targetAny object to the left of or above the user selection in the source is used as the prompt answer for the target. In other words, this method passes all the selections made on the source, rather than just the selection made for the link.


  5. For all the links on an object, users can specify whether the target opens in the same window as the source (replacing the source) or in a new window when a user clicks the link in Strategy Web.
  6. Click OK to return to the source report or document.

To use the link, do one of the following:
 

  • In Strategy Developer, execute the source report.
  • Right click on the object which contains the link, as shown below:
ka02R000000kc0sQAA_0EM440000002EoW.jpeg
  • Select the link to execute.
  • Target report is presented to the user.

Comment