EducationSoftwareStrategy.com
StrategyCommunity

Knowledge Base

Product

Community

Knowledge Base

TopicsBrowse ArticlesDeveloper Zone

Product

Download SoftwareProduct DocumentationSecurity Hub

Education

Tutorial VideosSolution GalleryEducation courses

Community

GuidelinesGrandmastersEvents
x_social-icon_white.svglinkedin_social-icon_white.svg
Strategy logoCommunity

© Strategy Inc. All Rights Reserved.

LegalTerms of UsePrivacy Policy
  1. Home
  2. Topics

KB34214: What happens when scheduled jobs exceed the "Scheduled Jobs per Project" setting specified in the project configuration?


Community Admin

• Strategy


What happens when scheduled jobs exceed the "Scheduled Jobs per Project" setting specified in the project configuration?

At the Project Configuration level there are a variety of governing settings that control how jobs are handled for a specific project.
 

ka04W00000148HIQAY_0EM440000002An6.jpeg

 
In some systems it is desired to limit the number of scheduled jobs a user can run at one time. This setting is going to determine the number of scheduled jobs an specific user will be able to run at a given moment. If more jobs are scheduled to run, they will need to wait until previous jobs executions finish. 
 
This can be confirmed by checking the DSSErrors.log file. A message similar to the following will be logged when this governing setting is violated:
 


[Kernel][Scheduler Trace][0x80043033] Number of jobs has exceeded maximum for project 2.[2][Strategy Tutorial]