The default date format in MicroStrategy Developer is 'm/d/yy', or '1/1/00'. This article explains about how to format a date in MicroStrategy Developer.
The default date format in Strategy Developer is 'm/d/yy', or '1/1/00', as shown in the screen shot below:
To change the date format for Strategy Developer reports, perform the following steps:
On the machines on which the Strategy Developer and Intelligence Server are installed, access Settings > Control Panel > Regional Options > Date. Change the 'Short date format' from m/d/yy to m/d/yyyy (or other specified format) in the dropdown list, as shown below:
Disconnect and reconnect to project source and re-execute the report.